We feature a stunning timelapse that documents the arrival of the first commercially available PR 776 Mining Dozer into the Port of Melbourne; follows its journey to the Liebherr-Australia Head Office in Adelaide, and subsequent fit-out with mine site safety specifications required in Australia.



![[Job Story] Sea-View for Liebherr Cranes for the Construction of The Norwegian Ocean Technology Centre](https://www.heavyquipmag.com/wp-content/uploads/2026/01/liebherr-norwegen-trondheim-01-300dpi-218x150.jpg)
![[Job Story] Liebherr Cranes at Work for Winter Olympics 2026 in Italy](https://www.heavyquipmag.com/wp-content/uploads/2026/01/liebherr-italy-olympic-winter-games-2026-04_300dpi-218x150.jpg)


![[Job Story] Two Liebherr Cranes Building Alaska’s Longest Single-Span Bridge](https://www.heavyquipmag.com/wp-content/uploads/2026/01/liebherr-lr1300.1sx_2_300dpi-218x150.jpg)



Copyright 2017-2025 All rights reserved.