DEUTZ is opening another service site, the DEUTZ Power Center Mid-America in the Dallas metropolitan region.
Customers have access to a comprehensive range of spare...
ERDCWERX is announcing the following opportunities to collaborate with the U.S. Army Engineer Research and Development Center (ERDC). Small businesses, including construction equipment manufacturers...
PCL Construction announces the introduction of Job Site Resourcing, an intelligent application integrated within PCL’s Job Site Insights smart construction platform supporting next generation...
Australia currently has defeated COVID-19 and the government is reviving the infrastructure industry. Our Magazine is proudly media partner of the Connected Industry Conference...
Civil engineering company Veidekke builds for Bane NOR a new double-track railway tunnel from Drammen to Kobbervikdalen in Norway with Epiroc underground machines.
When the...
Leading energy transition towards an increasingly sustainable transport model not only requires expertise and state-of-the-art technology, but also practical and accessible solutions that demonstrate...
Doka's shareholding in the American scaffolding manufacturer AT-PAC creates a strong global unit that combines international sales strength with decade-long know-how in Scaffolding. In...
The energy markets are undergoing a massive transformation as governments around the world transition away from fossil fuels towards the integration of renewable energy.
This...
Red Sea Gateway Terminal (RSGT) has taken delivery of two state-of-the-art remote-controlled Ship-to-Shore (STS) cranes, and 10 hybrid-Rubber-Tyred Gantry Cranes (RTGs), as part of...
The 3D automatic control system is designed to mill a surface with an accuracy of 3 millimeters. In Kutter's previous experience, only large machines...



![[Job Story] Veidekke Builds a New Railway Tunnel in Norway Employing Epiroc’s Machinery](https://www.heavyquipmag.com/wp-content/uploads/2021/01/screencapture-epiroc-en-au-customer-stories-2021-veidekke-giant-project-2021-01-29-11_24_55-e1611915994114-1-e1611918040940-696x385.png)



![[Job Story] Compact Milling on Top of Berlin Subway with the Trimble PCS900 3D System](https://www.heavyquipmag.com/wp-content/uploads/2020/11/Kutter_3D_Berlin_02_edited-2-1-scaled-e1606917260583-696x385.jpg)
Copyright 2017-2025 All rights reserved.