Home Tags Potain tower cranes

Tag: Potain tower cranes

The 18 Potain tower cranes that make up the foundation site for the Fécamp wind farm will all be equipped with DCS 61-S anti-collision systems. An offshore wind farm with 71 wind turbines will be located between 13 and 22...