Tag: Indeco
The Victoria State Government has planned the construction of a water recycling pipeline running beneath the Werribee River bed, near the town of Eynesbury....
In 2024, Ward Demolition was involved in the partial demolition of the west grandstand of the Eden Park Stadium in Auckland. The company used...
Indeco has unveiled both new additions to its product lineup and upgraded models at Bauma 2025, further expanding and enhancing its range offering with...
Two Indeco HP 5000 hammers have been used on the demolition project of LaPrele dam in Douglas, Wyoming. The project involves the deployment of...
The decommissioning of the former Enel plant in Piombino is one of the largest and most complex construction sites of this type in Europe....
The section of the Bari-Barletta railway line that crosses Andria city centre is being moved below ground level, a project that involves digging a...
As always, Bauma represents an important showcase for Indeco to exhibit the latest main trends in arrival to an audience of qualified operators. Innovations...
The demolition of the Deutsche Post headquarters in Berlin, a three-storey building made of reinforced concrete and 50 to 80 mm iron, was a...
The new range of IMH hydraulic mulching heads, two smaller demolition attachments, plus two key technological updates which improve product efficiency and end-user safety.
At...


![[Job Story] Indeco HP 12000 and HP 9000 Hammers at Work on Riverbanks near Melbourne](https://www.heavyquipmag.com/wp-content/uploads/2025/05/14-HP-9000-Werribee-River_1-696x385.jpg)
![[Job Story] Indeco IMP 15 and IMG 600 Demolish Stadium Grandstand in New Zealand](https://www.heavyquipmag.com/wp-content/uploads/2025/05/12-IMP-15-Eden-Park-696x385.jpg)

![[Job Story] Two Indeco HP 5000 Hammers for Rocky Mountains Demolition Project](https://www.heavyquipmag.com/wp-content/uploads/2025/05/08-HP-5000-USA_1-696x385.jpg)
![[Job Story]Two Indeco Shears at work in Piombino (Italy)](https://www.heavyquipmag.com/wp-content/uploads/2022/10/Picture16-696x385.jpg)
![[Job Story] Indeco Hydraulic Hammers for the Bari-Barletta Railway Line](https://www.heavyquipmag.com/wp-content/uploads/2022/10/Indeco-1024x684-1-696x385.jpg)

![[Job Story] Another Challenge for Indeco: The Demolition of the Headquarter of the Deutsche Post in Berlin](https://www.heavyquipmag.com/wp-content/uploads/2021/03/IMG_4669-696x385.jpg)

Copyright 2017-2025 All rights reserved.